YOUR CURRENT POSITION: Home > Case
110KV & 220KV TRANSMISSION LINE Hardware PROJECT IN CHILE
Release time: 2024-06-28
The 110KV & 220kV transmission line projects are major electrical infrastructure projects in Chile that involve the construction of a high-voltage transmission line to transport electricity from a power generation station to a substation. The projects are designed to meet the growing demand for electricity in the region and to improve the reliability and efficiency of the power grid.
The main products that we supplied are compression tension clamp, suspension clamp, anchor shackle, ball eye, turnbuckle and other link fittings. 
Once completed, the transmission line will be an important part of the regional power grid, providing a reliable and efficient means of transporting electricity to the substation. The project will also contribute to the economic development of the region, by enabling the expansion of industrial and commercial activities that require a stable and secure supply of electricity.

 
Related products
Single Core ABC Cable Suspension Clamp Suspension Assembly
Single Core ABC Cable Suspension Clamp Suspension Assembly
11KV distribution line lightning surge arrester
11KV distribution line lightning surge arrester
Suspension clamps(with socket-clevis)
Suspension clamps(with socket-clevis)
Double Arming Bolts
Double Arming Bolts